Ayyub, B M and Haldar, A (1984) Project Scheduling Using Fuzzy Set Concepts. Journal of Construction Engineering and Management, 110(02), 189–204.

Collier, C A and Jacques, D E (1984) Optimum Equipment Life by Minimum Life‐Cycle Costs. Journal of Construction Engineering and Management, 110(02), 248–65.

Grimm, C T (1984) Facade Topography in Masonry Failure Investigation. Journal of Construction Engineering and Management, 110(02), 145–51.

Hulshizer, A J and Desai, A J (1984) Shock Vibration Effects on Freshly Placed Concrete. Journal of Construction Engineering and Management, 110(02), 266–85.

Jaafari, A (1984) Criticism of CPM for Project Planning Analysis. Journal of Construction Engineering and Management, 110(02), 222–33.

Koehn, E and Espaillat, C A (1984) Costs and Benefits of MBE Rules in Construction. Journal of Construction Engineering and Management, 110(02), 235–47.

Maloney, W F and Jones, T W (1984) Labor‐Management Cooperation: Operation MOST. Journal of Construction Engineering and Management, 110(02), 205–21.

Rogge, D F (1984) Delay Reporting Within Cost Accounting System. Journal of Construction Engineering and Management, 110(02), 289–92.

  • Type: Journal Article
  • Keywords: Accounting; Construction management; Construction methods; Cost control; Delay time;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1984)110:2(289)
  • Abstract:
    There is an imbalance in the visibility of costs of delays in the daily construction site work routine and the costs of overhead expenditures which to a large extent determine the magnitude of these delays. This imbalance frequently means that overhead expenditures are carefully scrutinized while delay costs may be totally ignored. The resulting suboptimization may not result in the lowest total project cost. A procedure is proposed to address this problem. The procedure works within existing cost accounting systems and is a modification of existing foreman-delay survey methods.

Thomas, H R, Guevara, J M and Gustenhoven, C T (1984) Improving Productivity Estimates by Work Sampling. Journal of Construction Engineering and Management, 110(02), 178–88.

Thomas, H R, Heuer, D W and Filippelli, R L (1984) Settlement of Construction Jurisdictional Disputes. Journal of Construction Engineering and Management, 110(02), 165–77.

Van Der Meulen, G J R and Money, A H (1984) The Bidding Game. Journal of Construction Engineering and Management, 110(02), 153–64.